Florida / New York

A Publication for the Practicing Medical Specialist, Industry Executive & Investor

Step-by-Step Process Installing an Inground Swimming Pool in South Florida | 8 Steps

Step-by-Step Process Installing an Inground Swimming Pool in South Florida

Advertise With Us

Join Our Family

Of Advertisers
Click Here

In South Florida, installing an inground swimming pool constitutes a significant undertaking that encompasses various phases, commencing with the design process and culminating in the inaugural swim. Subsequent to the completion of the inground pool installation, the commencement of recreational activities awaits.

Presented here is a detailed outline delineating the anticipated progression throughout this endeavor, encompassing elements such as materials, excavation, and additional components. Read on to learn more:

Step 1: Planning and Design

What happens:

  • Choose the type of pool: Concrete, or Shock Crete

  • Decide on shape, size, and features (e.g., spa, waterfall, lighting)

  • Obtain necessary permits and zoning approvals from your local municipality

Step 2: Excavation

What happens:

  • The area is marked out and excavation equipment is brought in

  • The hole is dug according to the design specifications

  • Soil is removed or relocated (sometimes kept for landscaping)

Step 3: Pool Structure Installation

Depends on Pool Type:

  • Concrete/Gunite Pool:

    • Steel rebar framework is installed

    • Gunite (sprayed concrete) is applied over the frame

    • Curing time: typically 1–2 weeks

Step 4: Plumbing and Electrical

What happens:

  • Pipes for filtration, drainage, and returns are installed

  • Electrical systems for pumps, lights, heaters, etc., are set up

  • Grounding and bonding for safety compliance

Step 5: Decking and Coping

What happens:

  • Concrete or paver decking is installed around the pool

  • Coping (the edge of the pool) is added

  • Drainage and expansion joints are included

Step 6: Pool Interior Finish (Concrete Only)

What happens:

  • Plaster, pebble, quartz, or tile finish is applied inside the pool

  • The surface is smoothed and then allowed to cure

Step 7: Fill and Start-Up

What happens:

  • Pool is filled with water (via hose or water delivery)

  • Chemicals are added and the water is balanced

  • Equipment is tested and fine-tuned

Step 8: Final Inspection and Handover

What happens:

  • Final inspections are conducted by local authorities

  • Homeowner is trained on how to maintain and operate the pool

  • Pool is officially ready for use!

Conclusion:

Remember, it is vitally important to search for pool builders who are known for installing an inground swimming pool in South Florida with excellent Google Reviews, have been in the industry for several years, and employ full-time staff.